(TCO 8) In which phase of the systems development life cycle are the new hardware and software for a system tested? (Points : 2)

$9.99
ACCT 451 Accounting Information Systems with Lab Week 7 Quiz Answers

 

1. (TCO 8) In which phase of the systems development life cycle are the new hardware and software for a system tested? (Points : 2)

1. (TCO 8) One step in the systems development life cycle (SDLC) identifies and evaluates design alternatives and to develop design specifications.  This step is called (Points : 2)

2. (TCO 8) What is most difficult item to quantify when assessing economic feasibility? (Points : 2)

2. (TCO 8) What is the basic model used to create a framework for economic feasibility analysis? (Points : 2)

3. (TCO 8) When canned software is used for systems acquisition, the physical design phase of the SDLC (Points : 2)

3. (TCO 8) When canned software is used for systems acquisition, the conceptual design phase of the SDLC (Points : 2)

4. (TCO 8) Which statement below regarding prototyping is false? (Points : 2)

4. (TCO 8) What is an advantage of prototyping? (Points : 2)

5. (TCO 8) Test transaction processing involves (Points : 2)

5. (TCO 8) Acceptance tests involve (Points : 2)

6. (TCO 8) What are the different types of documentation that should be prepared for a new system? (Points : 5)

6. (TCO 8) What are the controls design considerations in a new AIS? (Points : 5)

7. (TCO 8) Explain the concept of an application service provider. (Points : 5)

7. (TCO 8) What are the key things an organization can do to enhance an RFP to be sent to vendors? (Points : 5)